post-img

Monday, 23 August 2021

Admin

News

4148 times seen

Preliminary Meeting for Feasibility Study Activities on Ring Road 1 Samarinda

Wednesday, August 18 2021

Preliminary Meeting for Feasibility Study Activities on Ring Road 1 Samarinda. Regarding the technical aspects of studies related to traffic flow, it is hoped that this will be the focus and it is hoped that topographic studies related to drainage placement will be really looked at.

This activity is a continuation of the construction of Jalan Ring Road I Samarinda (Mahulu Bridge - Jalan Jakarta). The target/product resulting from this activity is a feasibility study document containing technical, economic and environmental feasibility indicators, which is an initial design document as a basis for preparing subsequent detailed designs.