Presentation of reports between DED studies of construction of cuseway connecting roads and Maloy Sea Port buildup reports
Wednesday, July 21, 2021. Following up on the work contract "DED Study of the Construction of the Causeway Connecting Road and the Maloy Sea Port Stacking Field on May 25, 2021 which was carried out by the CV consultant CV. Buana Engineering Consultant, which is now entering the intermediate report stage, a report presentation is carried out to gather suggestions and input from related stakeholders to ensure the quality of work/reports and improve coordination, synergy, and good planning results.
Study DED Development of the Causeway Connecting Road and the Maloy Sea Port of East Kutai Sea Port of East Kalimantan Province is carried out in order to accelerate the achievement of national economic development, it is necessary to increase investment through the preparation of areas that have economic and geostrategic excellence. The area is prepared to maximize industrial activities, exports, imports and other economic activities that have high economic value. Development of KEK aims to accelerate regional development and as a breakthrough model of regional development for economic growth, including industry, tourism and trade so as to increase employment.